Independent China procurement coordinationPrepare a tire RFQ →

Passenger · Light truck · Commercial

Michelin Tire Procurement Desk

Send one size list. Compare China tire sourcing quotes on the same specification, packing and shipping basis.

Independent procurement coordination for importers, distributors and fleets.

01 / Catalog

Three ways to build a tire order

Unbranded passenger radial tire

Passenger radial tires

Compare size, service description and seasonal tread for the destination market.

View tire catalog →
Unbranded light truck tire

SUV and light truck tires

Record load range, duty mix and whether the tire runs single or dual.

View tire catalog →
Unbranded highway truck tire

Truck and bus radials

Separate steer, drive and trailer positions before comparing tread and loading plans.

View tire catalog →

02 / Specification

What goes on the size list

Passenger tire inputs
SizeCopy the complete sidewall designation, including any reinforced or run-flat requirement.
Load and speedKeep the load index and speed rating together. Matching the nominal size alone can leave a service description mismatch.
Market and treadRecord the sales market, season, tread preference and required labeling evidence for that SKU.
Light truck tire inputs
FitmentState vehicle and rim specification alongside tire size and load range.
LoadingIdentify single or dual fitment and the corresponding load requirement.
DutyDescribe payload, road surface and expected highway versus unsealed-road use.
Truck and bus tire inputs
Axle positionSplit steer, drive and trailer requests before listing accepted tread patterns.
Service descriptionProvide size, load index, speed rating, axle load and operating conditions.
Order mixProvide units per line, destination port and whether split shipments are acceptable.

03 / Procurement sequence

From size list to decision

  1. 01

    Freeze the brief

    Clarify substitution rules before sourcing. Keep alternatives on separate quote rows.

  2. 02

    Compare quote lines

    Record supplier, model, quantity basis, packing and named Incoterm place in each row. Mark missing fields for clarification.

  3. 03

    Confirm release criteria

    Agree sample checks, inspection scope and shipment document responsibilities before buyer approval.

04 / Buyer types

Start with the buying program

05 / Evidence

Evidence before commitment

Supplier records

Confirm the quoting entity and manufacturing site. A management-system certificate describes the listed site and scope.

Sample check

Compare the sample sidewall and tread against the quote, and record the supplier model and sample identification.

Document scope

Match any product report to the exact model, service description, test method and destination requirements.

Inspection scope

Agree lot identification, sampling and acceptance criteria with the buyer and independent inspection provider.

Packaging review

Confirm unit counts, labeling and any restrictions on nesting before comparing the load plan.

Buyer approval

Record exceptions and open documents on the same quote revision before authorizing an order.

06 / Questions

Before you request a quote

Yes. Add axle or vehicle duty, destination market and required service description before treating options as comparable. A line such as 225/45R18 95W states the size, load index and speed rating together. It still needs the vehicle and market context.

Submit quantity by size and identify which lines can ship separately. Feasibility depends on supplier minimums, packaging restrictions, axle weight planning and consolidation arrangements.

Request written confirmation for the exact SKU, quantity and quotation revision. Sample approval, inspection scheduling and transport booking can affect the window.

07 / Send your brief

Quote the order you plan to place

Begin with your most important size and delivery destination. Add the balance of the size list in the message.

  • Keep the service description with each size
  • Separate acceptable alternates
  • Flag documents required before purchase